24/7 Electrical Maintenance Response · Island-Wide

Project portfolio

Our Projects

From power-plant instrumentation to water infrastructure, our recent portfolio spans electrical, mechanical, civil, HVAC, plumbing and instrumentation works for public agencies and private industry across Jamaica.

0MWPower plant instrumentation
0Reserve water tank systems
MEPCommercialCorporate Area

Complete MEP Works for a Commercial Building

Mechanical, Electrical and Plumbing (MEP) works for a commercial building in the Corporate Area included the complete design coordination, supply, installation, testing and commissioning of all major building services.

The scope also involved high-efficiency Variable Refrigerant Flow (VRF) air conditioning, electrical power distribution infrastructure, photovoltaic (PV) solar panels, fire detection and suppression systems, domestic plumbing and the complete telecommunications infrastructure — plus power systems, cable containment, distribution boards, standby power provisions, water supply and drainage, and all associated control and monitoring equipment.

VRFAir conditioning
PVSolar panels
FullFire & telecoms
CivilElectricalStandby power

Emergency Generator System

Civil and electrical design-build of an emergency generator system to enhance the reliability and resilience of the facility’s power supply. The works included an auxiliary electrical room housing new 800A service-rated electrical equipment, a 4,000-gallon fuel storage tank complete with a bund area and a concrete generator plinth.

The project also upgraded ageing electrical infrastructure, installed underground duct banks and cabling, equipment foundations, earthing and lightning protection — minimising disruption to ongoing operations while delivering a robust, code-compliant standby power solution.

Design& build
800AService equipment
4,000Gallon fuel tank
CivilStructuralHVACMEPBuilding construction

3,000 sq ft Ammonia Equipment Building

Construction of a 3,000 sq. ft. ammonia equipment building at a warehouse in Jamaica — civil and building construction, site development and MEP services, including reinforced concrete foundations, walls and floor slabs, structural steel framing, roofing systems and architectural finishes.

Site works included earthworks, grading, utility connections, paving and an external stormwater drainage system. The MEP scope encompassed HVAC for equipment ventilation, plumbing and drainage, internal and external electrical distribution, lighting, grounding and power systems, and a fully integrated fire detection and alarm system — all tested, commissioned and quality-assured.

3,000Sq ft
MEPFull scope
FireDetection & alarm
Electrical designGeneratorATS

Facility Distribution & 300kVA Standby Power

Design of the electrical distribution system for both the JPS power supply connection and the facility’s internal distribution network — including detailed load assessments, design drawings and specifications, utility coordination and the integration of low-voltage distribution panels and protective devices.

The scope included a 300kVA standby generator system complete with Automatic Transfer Switch (ATS) infrastructure, an electrical room with appropriate ventilation and fire protection, cable management, grounding and lightning protection — fully tested and commissioned to applicable standards.

300kVAStandby generator
ATSSeamless transfer
JPSUtility coordination

Ongoing

45 MW Steam Turbine Generator — Electrical & Instrumentation

Electrical and instrumentation works for the installation of a 45 MW steam turbine generator, carried out within the powerhouse while the facility remained in full operation — requiring careful planning and phased execution to minimise disruption.

The scope includes all electrical equipment, cabling and auxiliary components, all instruments including fibre optic networks, data, I/O, discrete and analog signal wiring and pneumatic connections; testing, termination and verification of HV and LV cabling; commissioning of PLC cabinets, motor control centres, switchgear and synchronisation panels; lighting, pumps, receptacles, cable trays and grounding systems.

45 MWSteam turbine
PLC& MCC commissioning
LiveOperating plant
Pipe layingElectricalMechanical

Water Balance Condensate Cooling Pond — Piping & Electrical Installation

Installation of all the piping and electrical infrastructure required to convey and control condensate from Buildings 40 and 42 to the pond, and from the pond to the cooling towers and dust suppression tank.

The works involve structural steel supports, piping and electrical installations carried out across various departments of an operating alumina refinery, with piping systems routed both below and above ground.

2Buildings connected
Above& below-ground piping
E&MElectrical & mechanical

Let’s build

Let’s build your next project — the safe way.

Chat on WhatsApp
Call Request a Quote